Floor heating acceptance process and pressure test requirements

Floor heating acceptance process and pressure test requirements



As more and more homes are warmed up, more and more problems arose. Now Shanghai Fushan Floor Heating Experts will explain them to you.

(1) The experimental pressure shall not be less than 0.3 MPa for static pressure in the system and shall not be less than 0.6 MPa.

(2) Prior to the hydrostatic test, safe and effective fixing and protective measures should be taken for pressure test piping and components.

(3) Water Pressure Test Procedure:

1. Slow water injection by the water separator, while eliminating the gas in the pipeline.

2, water filled with water after the inspection.

3. Use a manual pressure test pump to slowly pressurize. The boost time should not be less than 15 minutes.

4. After boosting up to the specified experimental pressure, stop the pressurization. After one hour of regulation, observe that the pressure drop is not more than 0.02 MPa.

Semi Automatic Blister Vacuum Forming Machine

1) The machine is automatic,person just need put the material on the machine,others functions can be down automatically.

2) One people can operate several machine,greaqtly save the people cost.

3) The far-infrared ceramic heating elements can control every single block heater temperature,more power-saving features,and reducing production cost.

4) The cooling system is independent by cold wind.

5) The machine can form all kinds of blister just replace the mould.

Dental Vacuum Forming Machine,Semi Automatic Blister Vacuum Forming Machine,Semi Automatic Vacuum Thermoforming Machine,Vacuum Blister Forming Machine

Hangzhou Xiaoshan Wanfeng Mechanical & Electrical Equipment Factory , https://www.hfweldingmachinery.com