Production Plant Phase II Construction Project

Production Plant Phase II Construction Project

Project Title: Phase II Project of Production Plant (August 2011-August 2012, 0.262 billion)
Region: Hubei Progress Stage: Filing Construction Period: August 2011 - August 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, and lighting facilities.
Project Description:
The project is located in the south of Linsha Road, Anfu Farm of Dongxihu Lake, and east of the 107 National Road. The second phase of the production plant is a construction project. The nature of the construction is: new construction. After completion and production, the company will annually produce 30 million square meters of corrugated cardboard, build a new production workshop with a total construction area of ​​9,000 square meters, purchase and install 29 sets of production equipment, and provide power supply, water supply and drainage, environmental protection, roads, greening and fire protection. engineering. The total investment of the project is 0.262 billion yuan.

Construction Unit: Wuhan Longfa Packing Co., Ltd. Postal address: Xin’andu Industrial Park, Dongxihu District, Wuhan Postcode: 430045
Telephone, 83371528

Related Developments: Tower Crane Infrastructure Project

V-shape Notch Mold

V-Shape Notch Mold,V-Shape Notch Cutting Die,Cathode V-Shape Notch Cutting Mold,Cathode V-Shape Notch Punch Mould

Guangdong Rixin Precision Technology Co., Ltd. , https://www.nissontooling.com