Cryogenic pump installation and operation requirements

Cryogenic pump installation and operation requirements

Cryogenic pump installation and operation requirements

First, the installation of cryogenic pump, the pump parts must be washed with a solvent clean, dry before assembly, non-staining with water and grease.
Second, the cryogenic pump itself and the pump suction pipe cooling measures must be in order to prevent the operation in the heat from the outside to vaporize the liquid, affecting the pump suction function.
Third, the cryogenic pump and its device to be put into operation before the need to clean, and then with a clean nitrogen and other cleaning, remove the pump of water and air, and pre-cooling.
Fourth, cryogenic pump suction inlet and suction pipe should have exhaust, so that the pump before operation or operation can be ruled out in a timely manner to accumulate the gas to ensure the reliable operation of the cryogenic pump.