Requirements for the use of pollution source online monitoring system

Requirements for the use of pollution source online monitoring system

First of all, whether it is sewage, exhaust gas or noise, monitoring instruments and data acquisition and transmission instruments (data acquisition instruments) need to be installed at the discharge port site. Due to the harsh environment, the requirements for instruments and equipment are very high, so the equipment must It is industrial grade and has certain protection capabilities. Secondly, the acquisition accuracy and acquisition capability of the data acquisition transmitter can meet the requirements, and a variety of communication means are available to meet the requirements of normal reporting of data under different conditions. Again, the stability and reliability of each instrument is better to minimize maintenance costs.
The pollution source online monitoring system has strong real-time performance. Compared with the short message service, because GPRS has real-time online characteristics, the system has no time delay and can receive and process various data of multiple/all monitoring points synchronously without round robin. It can meet the requirements of the system for real-time data collection and transmission. The collected pollution data and alarm information can be timely sent to the environmental protection monitoring department through the GPRS network to realize timely management of the pollutant discharge unit or individual, which can greatly improve the work efficiency of the environmental protection department. The pollution source online monitoring system can remotely control the instruments and equipment of each monitoring point. The GPRS two-way system can also realize reverse control of instruments and equipment, such as time correction, status report, switch and other control functions, and can perform remote online upgrade of the system. The construction cost is low, because the GPRS public network platform is adopted, there is no need to build a network, only the equipment can be installed, and the construction cost is low.
The data transmission rate of the pollution source online monitoring system is high, and the data transmission amount of each environmental information collection point is within 10Kbps. The transmission rate of GPRS network can reach 171.2kbit/s theoretically. The actual data transmission rate of GPRS is about 40Kbps, which can fully meet the data transmission rate (≥10Kbps) of this system. The communication cost is low, the monthly billing method is adopted, and the operation cost is low. It has good scalability. Since the current GSM/GPRS network has covered most of the provinces, there is basically no blind zone, and a wide range of online monitoring can be realized. Environmental protection information collection and transmission system requirements for coverage. The transmission capacity of the system is large, and the environmental protection center station must realize real-time connection with each environmental information collection point. Due to the large number of environmental information collection points, the system requirements can meet the needs of sudden data transmission, and GPRS technology can well meet the needs of transmitting bursty data.

Hydraulic Drilling Rig

Mainly used for drilling water wells, monitoring wells, geothermal air condition ing hole construction, national defense projects,anti-floating anchor rod,cable anchor rod,high-pressure Rotary Jet Drilling Operations;At the same time, it is suitable for large diameter vertical hole construction in geotechnical engineer- ing such as hydropower station,railway,highway and city foundation, grouting reinforcement hole, small foundation pile holemicro-pile etc..

Construction Features:

1.The power head of drilling rig can change speed both mechanically and hydraulically. Suitable for down-hole Hammer,eel pipe, full casing and alloy rotary drilling methods.

2.Two large cylinders on the mast, lifting force up to 25 tons, eccentric with pipe drilling can be used to pull out casing,but also for small-scale non-excavation construction.

3.The rig uses inside and outside telescopic mast power head travel up to 7 meters, can drill 23 meters drill pipe at a time, reduce a time to add drill pipe, improve efficiency twice.


Hydraulic Drilling Rig,Hydraulic Rig Machine,Hydraulic Piling Machine,Hydraulic Drilling Machine

JIANGSU XI TEC ENVIRONMENTAL&DRILLING EQUIPMENT COMPANY CO.LTD , https://www.xitecdrillingwx.com