Mould steel NAK80,718H,P20,1.1730,2344,SKD61,2316,S136,3Cr13 etc. Plastic material PP,PS,PE,PET,TPR,PVC,PA,POM,ABS,PC,PPR etc. Mould base LKM,HASCO etc. Hot runner system HASCO,YUDO,D-M-E etc. Standard mould parts DME,HASCO,JIS,CUMSA etc Design software UG,PRO-E,AUTOCAD,MOULDFLOW,SOLIDWORKS etc Min mould life different steel different production, min mold life 200,000 shots Doff way Auto by ejectors, Doff plates, Air valves etc. Leading time 1week-2 months process CNC, High speed carve, E.D.M, Wire cut, Drill, Injection etc. Packing Free fumigation case
For over 20 years, botuo engineers have developed world-class cleaning and maintenance solutions. we have developed and improved our customized solutions for all sectors of industry and commerce.
That is why we are able to provide a range of products ,we did a great job in terms of quality, reliability, and economic efficiency. Our service ensures that our customers always have a contact person at any time and anywhere in the world.
our Industrial Plunger Pump unit are widely used in Ultra-High Pressure Water Jetting Applications
Surface Treatment
botuo`s product line is applicable in many branches of industry for the cleaning and preparation of surfaces, such as the removal of all types of coatings and rust. Other applications include emission-free disinfection and selective concrete removal
Water Jet Cutting
botuo cutting tools have an excellent reputation in the construction and demolition industries, and have the ability to cut reinforced concrete, steel or ceramic. In addition, the tools can be applied to the simple dismantling of containers, steel structures and buildings. botuo cutting tools do not generate heat at the cutting edge, are dust-free, and produce low vibration.
Industrial Cleaning
botuo systems are indispensable when it comes to cleaning within the chemical and manufacturing industries. Many companies rely on our systems to effortlessly remove varnish, paint, resin, and caked debris from containers without leaving residue behind. botuo machine are certified as extremely safe products.
High Pressure Water Pump,High Pressure Water Pump Electric,Ultra High Pressure Water Pump,Industrial High Pressure Water Pump Zhejiang Botuolini Machinery Co.,Ltd , https://www.chinaplungerpump.com
 Q&A on the plastic injection mold
Â
Q. I have an idea for a new product, but don't know if it can be manufactured. Can you help?
A. Yes! We are always happy to work with potential customers to evaluate the technical feasibility of your idea or design and we can advise on materials, tooling and likely set-up costs.
Q. What are the advantages to having my parts manufactured locally?
A. Vertex can offer quick reaction times to any changes in specification, batch size or material. We can ship small or large quantities anywhere in Europe overnight to accommodate unforeseen changes in demand.
Q. My components have already been developed on CAD. Can you use the drawings?
A. Yes! DWG, DXF, IGES, Solidworks and Rhino files can all be used to generate quotes, models and mould tools - this can save time and money in producing your parts.
Q. Can I test my idea/component before committing to mould tool manufacture?
A. Yes, we can use CAD drawings to make models for design and functional evaluations.
Q. What type of plastic is best for my design/component?
A. Materials selection depends on the application of your design and the environment in which it will function. We will be happy to discuss the alternatives and suggest the best material.
Â
Q. What type of mould tool do I need?
A. Mould tools can be either single cavity (one part at a time) or multi-cavity (2,4, 8 or 16 parts at a time). Single cavity tools are generally used for small quantities, up to 10,000 parts per year whereas multi-cavity tools are for larger quantities. We can look at your projected annual requirements and recommend which would be best for you.
Â
Q.Ok, I've decided to go ahead with my project. How long will it take to get my parts?
A. It can take 3or6 weeks to have the mould tool manufactured depending on the part's complexity and the number of impressions (single or multi). After we have received final approval by you of the new tool, you can expect delivery of parts within 3-5 days.
Â
Plastic Cosmetic Mould Perfume Bottle Blowing Mould>
Model NO.: GQ20
Runner: Cold Runner
Design Software: Pro-E
Installation: Mobile
Certification: TS16949, CE, ISO
Standard: DME
Customized: Customized
Mould Base: Dme
Trademark: GQ
Transport Package: Wooden Case
Origin: Dongguan
plastic cosmetic mould perfume bottle blowing mould